Faster delivery from now on of ZE screw elements

Inspirations

Faster delivery from now on of ZE screw elements
| Andreas Weseler

Standard screw elements now available within 10-12 weeks

KraussMaffei has realigned itself in line with global market requirements and customer expectations, investing several million euros in expanding its production capacity and building up inventories. This also serves our top priority of ensuring that customers can continue to produce quickly if necessary, thus avoiding long downtimes.

Shorter delivery time for higher availability

As a result of this strategy, our customers can now be- nefit from substantially reduced delivery times for about 90% of our screw element portfolio for the ZE-UT, ZE-UTX and ZE BluePower twin-screw extruder series. The previous lead time of 16-18 weeks for Z9, Z10, Z44 and Z55 materials will be reduced with immediate effect. From now on, the delivery time for all standard screw elements is 10-12 weeks and has thus been shortened by over 30 percent. In addition, we have extended our inventory of off-the-shelf parts, so that customers will also benefit from a substantially higher percentage of instantly available screw elements.

Contact

Spare parts service
spares@kraussmaffei.com
Trouver des articles sur des sujets similaires:
CES ARTICLES POURRAIENT VOUS INTERESSER
With less energy "from melt to pellet"

With less energy "from melt to pellet"

22.12.2024 | Andreas Weseler

Prelude to K 2022 – Make plastic green

Prelude to K 2022 – Make plastic green

22.12.2024 | Petra Rehmet, Andreas Weseler, Uli Pecher, Gerhard Konrad

KraussMaffei wins the iF Design Award 2022

KraussMaffei wins the iF Design Award 2022

22.12.2024 | KraussMaffei

Flexible pipe production at the push of a button

Flexible pipe production at the push of a button

22.12.2024 | Andreas Weseler